

Campus work
November 11, 2016
Two campus grounds improvements took place this week.
Creekside Landscaping used a load of topsoil to level low spots in the side and back yards so that students would be less likely to stumble during recess games. Seed and straw topped off the newly leveled ground.
Additionally, the parking lot was reshaped, and ruts were smoothed for an easier entrance to and through the parking areas.